Littleworth Flooding update
Over the years, many of you will have experienced the flooding issue outside NJK School, and it has been top of the Parish Council’s agenda for some time. I’m therefore pleased to inform you that we seem to have some movement! Regrettably, we may well experience flooding again this autumn/winter, but there is a plan to resolve it early next year. After a lot of pushing, teams across Worcestershire County Council (WCC) (Flood Risk Management, Highways, PRoW), Wychavon District Council (WDC), and partner agencies are now working together to investigate and deliver drainage and flood mitigation measures across the village.
Here is a summary of the current progress, planned works, and next steps:
Ongoing Investigations, Planning and Improvement works
- Upstream Drainage: Planning improvements to drainage immediately upstream of the area, including around the old Methodist chapel.
- Road Culvert: Inspection of the road culvert, including a full survey and any necessary maintenance.
- Infrastructure Audits: Clarifying details around wider highway and Severn Trent drainage assets.
- Downstream Ditch Clearance (Mid-Dec): The WCC Highway Drainage Team will clear sediment, lower bed levels in key spots, and manage vegetation downstream of the culvert. A local landowner has already completed initial maintenance following early enforcement, and council teams are stepping in to complete the remaining stretch to ensure rapid progress.
- Church Drainage Connection (Targeting May Half Term): Preparations are underway to link the Methodist chapel site drainage into the main highway system. Installing the required cross-road pipe will require road closure, so this work is planned for the May school holiday (subject to methodist church cooperation).
We understand the frustration regarding timescales, but this has been ongoing for years and at least we now have a plan. WCC is intending to schedule a public meeting as soon as possible to discuss these plans and answer any questions. Further updates will follow!’
Emergency Planning
Wychavon is encouraging both households and public buildings to have emergency plans in place for what they believe are increasingly likely events, e.g., extreme heat, extreme cold, floods, and grid outages.
Here you can download the Household Emergency Plan leaflet
A quick guide to preparing your family and home for emergencies
Campaign to encourage residents to “Recycle Right”
Every yoghurt pot, sauce jar and food tray placed in the recycling bin has the potential to be given a new life, but only if it is clean and free from contamination. That is the message behind our new campaign, which is encouraging residents to give their recycling a quick rinse before placing it in their green bin.
Food residue and liquids left inside recyclable items can contaminate other materials around them, making them harder to recycle and increasing the risk of loads being rejected. By taking a few extra seconds to wash out containers, residents can help ensure that more of their recycling is successfully processed and turned into new products.
The campaign highlights a simple message to Recycle Right, using clear imagery and straightforward messaging like the one below. Whether it’s a baked bean tin, yoghurt pot or jar, a quick rinse using leftover washing-up water is often all that is needed. Items do not need to be spotless, just free from excess food and liquid. It also debunks the frequent myth that recycling is washed at the recycling plant. Recycling is processed as it arrives, and jars of things like Nutella, when broken, can smear their contents over paper as it travels through the plant, rendering it unrecyclable.
Recycling correctly not only helps protect the environment but also reduces unnecessary costs associated with contaminated recycling. With thousands of households recycling every week across Wychavon, just small changes can make a big difference.
Natural Networks Grant Schemes
Alongside Wychavon’s Natural Networks community biodiversity programme, Worcestershire County Council have launched a Local Nature Recovery Strategy Delivery Fund.
Projects delivering multiple Potential Measures and larger-scale nature recovery outcomes are particularly encouraged to apply. The scheme can support projects that have at least 75% match funding for grants between £5,000 and £50,000.
Eligibility criteria and funding requirements can be found here: https://www.worcestershire.gov.uk/council-services/environment/sustainability/natural-networks-programme-lnrs-delivery-fund
You can also visit www.worcswildlifetrust.co.uk/natural-networks to find out more and register an interest in applying for a grant from both Natural Networks schemes.
Meeting dates
All the latest meetings can be found on the Wychavon calendar on modern.gov using this link: Wychavon Calendar